Introduction of 50 tons hand chain gourd
The 50-ton hand chain hoist belongs to the large-tonnage hand chain hoist series. Li’an can provide customers with various types of hand chain hoist products, including domestic and imported hand chain hoist products, no matter which kind of hand hoist is widely used in lifting places, especially the large-tonnage hand hoist, the load-bearing force is also relatively large. The difference between the large-tonnage hand hoist and the light-sized hand hoist lies in the structural design, in order to ensure the load-bearing capacity and stability, the large tonnage hand hoist adopts the design of single hook, double/multi-head and double/multi-row chain. Li’an can be customized according to the needs of the product processing.
Rules of use for 50 tons hand chain hoist
1, hand hoist should be checked before lifting the mechanical part of the equipment, wire rope, hooks, limit device should be intact, check electrical parts should be no leakage, grounding device should be good. Every time lifting the weight, 10cm off the ground should be stopped to check the braking situation, to confirm that the work can be carried out. RAINPROOF awning shall be provided for open-air operation.
2. Do not use electric hoist to lift with overload, do not hold the hand between rope and object when lifting, avoid collision when lifting.
3, lifting objects to bind firmly, and in the center of gravity. Heavy lifting walking, the weight off the ground should not be too high, is strictly prohibited from crossing the head of the heavy objects, work gap should not be suspended in the air.
4. If the hand chain hoist has a strange smell during hoisting, stop the car immediately to check the high temperature, find out the reason and deal with it before continuing to work.
5, hand hoist wire rope on the reel to be wound neatly, when the hook in place, the reel on the wire rope should not be less than three rounds.
6. Use the suspension cable electric switch to start, the insulation must be good, sliding must be free, and the correct operation of the button and pay attention to the standing position.
7. During lifting, when the weight falls due to a fault, emergency measures must be taken to lower the weight to an unattended place.
8, lifting the weight must be done to vertical lifting, not inclined to pull the weight, lifting the weight of unclear do not hang.
9. After finishing the work, the electric hoist should stop at the designated position, the hook should be raised, and the power should be cut off.